Document Type : Research Paper

Authors

1 Petroleum University of Technology(PUT)

2 M.S. in Project Management, Energy Economics & Management Department, Petroleum University of Technology, Tehran, Iran

Abstract

Abstract
The complicated nature of oil and gas projects demands the deployment of integrated and effective project management methodologies to achieve the project objectives including the scope, cost and timing of the project. However, the availability of alternative methods such as PMI/PMBOK, IPMA, and PRINCE2, high rate of project failure, and limited available resources can make decision making a challenge for project managers. Identification and ranking the most important factors in project management could be done through different methods i.e., MCDM, Regression analyse, or Structural equation modelings depends on the nature of data and the purpose of research. The main purpose of this research is to provide insight to project managers and oil and gas companies on the effect of PMBOK's 10 knowledge areas including Integration Management, Scope Management, Time Management, Cost Management, Quality Management, Human Resource Management, Communication Management, Risk Management, Procurement Management, and Stakeholder Management on critical success factors in oil and gas industry in Iran. PMBOK knowledge areas were measured through the Project Management Planning Quality (PMPQ) survey and the dependent variables which are critical success factors were operationalized through the Project Implementation Profile (PIP) questionnaire. A total of 100 questionnaires were distributed among project managers, senior managers and project experts in oil and gas organizations in Iran and 72 acceptable responses were received and analyzed through structural equation modelling (SEM). The model is statistically significant and accounts for 33.7 % of the variation of CSFs. The SRMR value of the modified model is 0.098 and therefore the model fit is appropriate. The overall positive relationship between the variables is observed. The results of SEM analysis indicated that the scope management is the most effective knowledge area with the weight equals to 0.855 followed by communication management and risk management with the weights equal to 0.818 and 0.756 respectively. 

Keywords

Main Subjects